DOT OIG recommendations · Department of Transportation
Federal Railroad Administration
4 open and 125 closed recommendations from DOT Office of Inspector General name this office as responsible, in the publisher's own file.
Source: DOT OIG Recommendation Dashboard, official export read .
4openpublisher's status
125closedall closed statuses
1open five years or morecounted from the issue date
Sep 12, 2018oldest open, issued
| Publisher's status | Recommendations |
|---|---|
| Closed | 125 |
| Open | 4 |
“Open” and “closed” are the publisher's words. AuditLine repeats them with the date it read them. It does not check whether a recommendation was carried out, and a closed recommendation is not proof that a problem was fixed.
Open recommendations, oldest first
- Ensures that AMTRAK complies with the equipment and real property management requirements.DOT OIG SA2018098-1 · issued Sep 12, 2018Open
- Finalize the process document for conducting a baseline review of all passenger railroads subject to 49 C.F.R. § 228.407 and complete the baseline review.DOT OIG ST2024020-18 · issued Mar 27, 2024Open
- Develop, document, and implement quality assurance/quality controls and standardized on-demand reporting for FRA’s new Secure Site.DOT OIG ST2025029-9 · issued May 14, 2025Open
- Develop and implement a procedure to ensure acquisition documentation is centrally stored in the asset management system or other readily available system to enhance support for FRA's…DOT OIG FI2026024-5 · issued Apr 14, 2026Open
Closed recommendations, most recently closed first
- Design and implement a solution to accurately record data necessary to track the net-book value of capitalized assets in FRA's asset management system.DOT OIG FI2026024-6 · issued Apr 14, 2026 · closed Nov 18, 2026Closed
- Design and implement a solution to accurately track historical activity for all APP transactions in FRA's asset management system.DOT OIG FI2026024-7 · issued Apr 14, 2026 · closed Nov 18, 2026Closed
- Develop and implement a procedure to ensure that disposals of future APP are accurately reflected in FRA's records and ensure current APP records are accurately recorded.DOT OIG FI2026024-8 · issued Apr 14, 2026 · closed Oct 29, 2026Closed
- Develop and implement procedures to record all acquisition data in the asset management system.DOT OIG FI2026024-4 · issued Apr 14, 2026 · closed Oct 23, 2026Closed
- Develop and implement procedures that ensure the timely recording of FRA-owned APP in the asset management system.DOT OIG FI2026024-3 · issued Apr 14, 2026 · closed Oct 15, 2026Closed
- Document the current RCS configuration that shows formulas for calculations performed by the system and data sources.DOT OIG ST2024020-15 · issued Mar 27, 2024 · closed Oct 7, 2026Closed
- Coordinate with FRA's program offices to develop and implement policies and procedures for the management of APP, including, but not limited to: a) a process to assign and delegate…DOT OIG FI2026024-1 · issued Apr 14, 2026 · closed Sep 30, 2026Closed
- Develop and implement policies and procedures that promote enhanced communication for property acquisitions, transfers, and disposals between the Office of Facilities and Asset Management,…DOT OIG FI2026024-2 · issued Apr 14, 2026 · closed Sep 30, 2026Closed
- Add a warning or disclaimer to future Annual Enforcement Reports that include legacy cases stating that the number of violations associated with cases and the violation totals published in…DOT OIG ST2025029-12 · issued May 14, 2025 · closed Jun 9, 2026Closed
- Train all safety inspectors and Specialists on how to accurately capture Roadway Worker Protection inspection activities using the correct Roadway Worker Protection activity codes and,…DOT OIG ST2025029-2 · issued May 14, 2025 · closed Apr 21, 2026Closed
- Modify the Railroad Inspection System for Personal Computers (RISPC) to only accept correct HOS-related inspection report entries and add activity codes to record defects and violations of…DOT OIG ST2024020-9 · issued Mar 27, 2024 · closed Feb 25, 2026Closed
- Remove Roadway Worker Protection activity and defect codes from the next version of the Track and Structures Compliance Manual.DOT OIG ST2025029-3 · issued May 14, 2025 · closed Feb 19, 2026Closed
- Develop, document, and implement automatic data quality checks on the data warehouse that transmits data for DataHub's FRA Inspection Defect Details Report.DOT OIG ST2025029-8 · issued May 14, 2025 · closed Feb 9, 2026Closed
- Incorporate current Roadway Worker Protection-related activity code definitions into the system inspectors use to record inspection reports, currently the Railroad Inspection Systems for…DOT OIG ST2025029-4 · issued May 14, 2025 · closed Jan 26, 2026Closed
- Develop and implement guidance for when it is appropriate to perform and how to document on-track safety program reviews, including documentation of new or change notifications received,…DOT OIG ST2025029-10 · issued May 14, 2025 · closed Nov 17, 2025Closed
- Develop and implement a process for updating the code definitions in the system inspectors use to record inspection reports, currently the Railroad Inspection Systems for Personal…DOT OIG ST2025029-5 · issued May 14, 2025 · closed Sep 9, 2025Closed
- Develop and implement centralized storage for documentation of FRA's Roadway Worker Protection oversight including but not limited to on-track safety program notifications, correspondence…DOT OIG ST2025029-11 · issued May 14, 2025 · closed Aug 11, 2025Closed
- Develop, document, and implement a process for analyzing excess service reports, identifying trends, and communicating results to enforcement staff.DOT OIG ST2024020-3 · issued Mar 27, 2024 · closed Aug 5, 2025Closed
- Improve how excess service reports are submitted by railroads or processed by FRA to facilitate data collection and analysis.DOT OIG ST2024020-4 · issued Mar 27, 2024 · closed Aug 5, 2025Closed
- Revise Roadway Worker Protection activity codes or guidance to capture when an inspector reviews on-track safety programs or manuals in part or in full.DOT OIG ST2025029-1 · issued May 14, 2025 · closed Aug 5, 2025Closed
- Add instructions for planning 49 C.F.R. Part 214 work to the Universal Inspection Planning Process with Territory Inspection Plans guidance.DOT OIG ST2025029-6 · issued May 14, 2025 · closed Aug 5, 2025Closed
- Use the Track and Structures Communications Hub or other FRA system to provide frequently updated Roadway Worker Protection-related data that inspectors can use to inform their oversight…DOT OIG ST2025029-7 · issued May 14, 2025 · closed Aug 5, 2025Closed
- Develop and implement training for OP and S&TC Division specialists and inspectors on reporting HOS-related inspections correctly, including the mandatory use of activity code 228 in…DOT OIG ST2024020-10 · issued Mar 27, 2024 · closed Jul 30, 2025Closed
- Document and implement HOS oversight planning processes, including guidance on data sources that should be used to inform planning.DOT OIG ST2024020-12 · issued Mar 27, 2024 · closed Jul 17, 2025Closed
- Develop, document, and implement a review process that includes the HOS SME to check the accuracy of HOS-related inspection reports.DOT OIG ST2024020-11 · issued Mar 27, 2024 · closed Jun 30, 2025Closed
- Update the OP Compliance Manual, the Signal Compliance Programs and Policies, and/or General Manual to clarify the definitions of HOS-related activity codes for OP and S&TC disciplines so…DOT OIG ST2024020-8 · issued Mar 27, 2024 · closed Jun 30, 2025Closed
- Add a warning or disclaimer to the fiscal years 2020 to 2023 Annual Enforcement Report files as a header or footer and to the FRA website where the Annual Enforcement Reports are housed…DOT OIG ST2025029-13 · issued May 14, 2025 · closed Jun 2, 2025Closed
- Formally document the HOS audit process, including factors to consider when selecting railroads for audit (such as complaints, excess reports, and/or other factors), in a compliance manual…DOT OIG ST2024020-5 · issued Mar 27, 2024 · closed May 20, 2025Closed
- Finalize and implement the draft HOS complaints SOP to provide details on the HOS SME's evaluation, investigation procedures, and tracking.DOT OIG ST2024020-1 · issued Mar 27, 2024 · closed Dec 17, 2024Closed
- Develop, document, and implement a process to routinely analyze HOS complaint data to identify trends and communicate results to enforcement staff.DOT OIG ST2024020-2 · issued Mar 27, 2024 · closed Dec 17, 2024Closed
- Develop, document, and implement guidance on producing Annual Enforcement Reports, including parameters for what information is included or updated, and validating the accuracy of reported…DOT OIG ST2024020-17 · issued Mar 27, 2024 · closed Dec 11, 2024Closed
- Evaluate inspector and SME staffing needs based on data to effectively perform HOS oversight, including audits, and document the results.DOT OIG ST2024020-7 · issued Mar 27, 2024 · closed Nov 25, 2024Closed
- Formalize existing RCC enforcement process guidance in a standard operating procedure, memo, or manual and provide training for users of RCS, including data quality steps.DOT OIG ST2024020-16 · issued Mar 27, 2024 · closed Nov 4, 2024Closed
- Develop and implement policy to evaluate whether to deobligate funds when there is a significant reduction in project costs prior to closeout.DOT OIG ZA2023014-8 · issued Feb 1, 2023 · closed Sep 26, 2024Closed
- Correct the RCS error that results in incorrect case-level violation counts.DOT OIG ST2024020-14 · issued Mar 27, 2024 · closed Jul 16, 2024Closed
- Develop and implement centralized storage for key HOS audit documents, such as executive summaries, inspection reports, or other pertinent correspondence.DOT OIG ST2024020-6 · issued Mar 27, 2024 · closed Jul 15, 2024Closed
- Finalize and implement the draft SOP for oversight of 49 C.F.R. § 228.407.DOT OIG ST2024020-19 · issued Mar 27, 2024 · closed Jun 24, 2024Closed
- Review and clarify FRA’s Civil Penalties Schedule to include all sections of 49 U.S.C. Chapter 211 and 49 C.F.R. Part 228 Subparts D and F in the published violation base amounts for HOS…DOT OIG ST2024020-13 · issued Mar 27, 2024 · closed Apr 9, 2024Closed
- Document and implement the track safety inspection planning processes, including guidance to district track specialists and inspectors on data sources that can be used to inform planning…DOT OIG ST2022028-6 · issued Apr 27, 2022 · closed Mar 6, 2024Closed
- Establish and implement measurable goals and metrics for assessing the effectiveness of the oversight program.DOT OIG ST2021027-1 · issued Jun 30, 2021 · closed Feb 1, 2024Closed
- Implement the plan to complete information system improvements and centralize Amtrak oversight data in accordance with established milestones. ВDOT OIG ST2021027-4 · issued Jun 30, 2021 · closed Feb 1, 2024Closed
- Incorporate change orders as a focus area in FRA’s annual review process.DOT OIG ZA2023014-7 · issued Feb 1, 2023 · closed Mar 31, 2023Closed
- Revise the Track and Rail and Infrastructure Integrity Compliance Manual to include specific guidance for inspectors completing ATIP-related inspection reports.DOT OIG ST2022028-3 · issued Apr 27, 2022 · closed Mar 22, 2023Closed
- Modify the programming logic of the Railroad Inspection System for Personal Computers so that the system will accept only correct ATIP-related inspection report entries.DOT OIG ST2022028-4 · issued Apr 27, 2022 · closed Mar 13, 2023Closed
- Develop and implement training for Track Division specialists and inspectors on how to correctly prepare ATIP-related inspection reports.DOT OIG ST2022028-5 · issued Apr 27, 2022 · closed Mar 8, 2023Closed
- Finalize and implement procedures for taking action to address Amtrak’s noncompliance with cooperative agreement terms and conditions.DOT OIG ST2021027-3 · issued Jun 30, 2021 · closed Oct 21, 2022Closed
- Document the current ATIP survey prioritization process and establish a schedule for running the prioritization tool with updated data.DOT OIG ST2022028-2 · issued Apr 27, 2022 · closed Sep 28, 2022Closed
- Update and implement Automated Track Inspection Program (ATIP) fleet utilization performance metric(s) and establish a process to monitor ATIP contractor performance.DOT OIG ST2022028-1 · issued Apr 27, 2022 · closed Aug 16, 2022Closed
- Complete and implement procedures for systematically tracking issues identified through reviews of Amtrak's use of Federal funds and compliance with cooperative agreements.DOT OIG ST2021027-2 · issued Jun 30, 2021 · closed Apr 27, 2022Closed
- Finalize the Operating Practices Compliance Manual chapter on conductor certification compliance and enforcement and distribute it to inspectors; include a process an inspector can use to…DOT OIG ST2020050-2 · issued Sep 29, 2020 · closed Aug 24, 2021Closed
- Develop and implement a procedure for reviewing and tracking new and updated railroad conductor certification programs.DOT OIG ST2020050-1 · issued Sep 29, 2020 · closed Jul 22, 2021Closed
- Update Drug and Alcohol program guidance for both railroads and inspectors to reflect the 2017 Maintenance-of-Way requirements.DOT OIG ST2020030-4 · issued Apr 29, 2020 · closed Mar 23, 2021Closed
- Revise and implement policies and procedures for when to escalate grant noncompliance issues within FRA. At a minimum, these procedures should include criteria for when to escalate…DOT OIG ST2020015-1 · issued Jan 22, 2020 · closed Mar 17, 2021Closed
- Revise and implement policies and procedures for defining FRA’s tolerance for the risk of grantee noncompliance with specific deliverable requirements, periodically assessing those risks,…DOT OIG ST2020015-2 · issued Jan 22, 2020 · closed Mar 17, 2021Closed
- Define a framework for determining the minimum acceptable standards of what an interim use plan for new infrastructure funded by FRA grants should provide, and procedures for evaluating…DOT OIG ST2020015-3 · issued Jan 22, 2020 · closed Mar 17, 2021Closed
- Develop and implement a plan for systematically conducting Part 242 compliance audits of all railroads to which the regulations apply.DOT OIG ST2020050-3 · issued Sep 29, 2020 · closed Feb 26, 2021Closed
- Develop and implement procedures that (a) direct the MTACs to describe each recommendation in terms of impact, such as safety or cost; (b) clearly state whether the recommendation is…DOT OIG ZA2019056-10 · issued Jul 10, 2019 · closed Jan 25, 2021Closed
- Develop and implement a process that ensures that completed MTAC oversight reports are uploaded and maintained at regular intervals in FRA’s Program Management Tracker database.DOT OIG ZA2019056-11 · issued Jul 10, 2019 · closed Jan 25, 2021Closed
- Develop, finalize, and implement procedures for FRA and the MTACs to use for all phases of project design oversight reviews and Rail Traffic Controller modeling simulation results.DOT OIG ZA2019056-6 · issued Jul 10, 2019 · closed Jan 25, 2021Closed
- Develop and implement a risk-based oversight process for non-safety field inspections to include criteria to determine which prospective projects could benefit at key project phases.DOT OIG ZA2019056-7 · issued Jul 10, 2019 · closed Jan 25, 2021Closed
- Revise the Monitoring Procedures to better align with FRA’s financial assistance programs and strengthen the MTACs’ role in the oversight of FRA financial assistance programs.DOT OIG ZA2019056-8 · issued Jul 10, 2019 · closed Jan 25, 2021Closed
- Develop and implement policies and procedures that require the MTACs to follow a consistent process for conducting oversight reviews and documenting deliverables in a manner appropriately…DOT OIG ZA2019056-9 · issued Jul 10, 2019 · closed Jan 25, 2021Closed
- KPMG recommends that FRA management develop an accrual methodology for incurred but not submitted grantee expenses at year-end.DOT OIG QC2020011-7 · issued Nov 18, 2019 · closed Dec 16, 2020Closed
- KPMG recommends that FRA management develop a process to improve communications between the Grant Office and Office of Financial Services to ensure all available expense information is…DOT OIG QC2020011-8 · issued Nov 18, 2019 · closed Dec 16, 2020Closed
- KPMG recommends that FRA management implement policies and procedures to establish a formal process to assess applicable third-party service organization reports that includes reviewing…DOT OIG QC2020025-3 · issued Apr 8, 2020 · closed Dec 16, 2020Closed
- KPMG recommends that FRA management implement policies and procedures to establish a formal process to assess applicable third-party service organization reports that includes implementing…DOT OIG QC2020025-4 · issued Apr 8, 2020 · closed Dec 16, 2020Closed
- Modify the Railroad Inspection System for Personal Computers (RISPC) to capture data that specifies the types of Part 242 oversight activities inspectors are recording.DOT OIG ST2020050-4 · issued Sep 29, 2020 · closed Dec 14, 2020Closed
- Develop and issue instructions on the proper entry of Part 242 activity codes in RISPC.DOT OIG ST2020050-5 · issued Sep 29, 2020 · closed Dec 14, 2020Closed
- Revise and implement guidance for FRA staff to conduct detailed assessments of grantees' procedures for complying with Federal expenditure requirements. This guidance should include steps…DOT OIG ST2020015-4 · issued Jan 22, 2020 · closed Nov 19, 2020Closed
- Develop and implement a formal written process for tracking all Part 219 audits.DOT OIG ST2020030-2 · issued Apr 29, 2020 · closed Nov 19, 2020Closed
- Develop and implement a written process for tracking and following up on all action items issued from Part 219 compliance audits to verify that railroads have taken corrective actions.DOT OIG ST2020030-3 · issued Apr 29, 2020 · closed Nov 19, 2020Closed
- Develop and implement written procedures for reviewing and approving railroads' Part 219 compliance plans, to include an oversight control, such as a supervisory or second-level review, to…DOT OIG ST2020030-1 · issued Apr 29, 2020 · closed Sep 1, 2020Closed
- Establish and implement a procedure for determining when to evaluate and, if necessary, adjust the normalizing constants for the accident prediction formula in U.S. DOT's Accident…DOT OIG ST2019063-1 · issued Sep 4, 2019 · closed Mar 19, 2020Closed
- Prepare and implement a comprehensive compliance manual for the grade crossing discipline that includes procedures for using grade crossing data to focus inspections and outreach.DOT OIG ST2019063-2 · issued Sep 4, 2019 · closed Feb 26, 2020Closed
- Update NEPA implementing procedures to reflect applicable environmental law and requirements and CEQ guidance, including the development of processes and timelines for updating categorical…DOT OIG CR2014010-1 · issued Dec 5, 2013 · closed Feb 13, 2019Closed
- KPMG recommends FRA retain evidence of the training provided to individuals with EA IT responsibility.DOT OIG QC2018013-5 · issued Dec 20, 2017 · closed Aug 21, 2018Closed
- Formalize the 49 CFR Part 225 audit process with written guidance that identifies basic procedures, standards of evidence, and common sources of information, along with a process to update…DOT OIG ST2017045-6 · issued May 3, 2017 · closed May 2, 2018Closed
- Develop and initiate regular training to FRA staff responsible for 49 CFR Part 225 audits and establish a procedure to update the training when necessary.DOT OIG ST2017045-7 · issued May 3, 2017 · closed May 2, 2018Closed
- Ensures that Amtrak complies with equipment and real property management requirements.DOT OIG SA2017105-1 · issued Sep 26, 2017 · closed Feb 26, 2018Closed
- Develop and implement procedures for tracking 49 CFR Part 225 audits of non-Class I railroads and identifying entities exempt from 49 CFR Part 225 reporting requirements.DOT OIG ST2017045-4 · issued May 3, 2017 · closed Jan 2, 2018Closed
- Establish a risk-based prioritization for auditing non-Class I railroads every 5 years. Part of the prioritization process should include determining whether any higher-risk non-Class I…DOT OIG ST2017045-5 · issued May 3, 2017 · closed Jan 2, 2018Closed
- Develop and implement a standard method for identifying and listing railroads in each FRA Region subject to 49 CFR Part 225 requirements.DOT OIG ST2017045-3 · issued May 3, 2017 · closed Dec 11, 2017Closed
- Update reporting guidance so users can more efficiently and accurately identify reporting requirements for different accident and incident types and better understand the definitions of…DOT OIG ST2017045-1 · issued May 3, 2017 · closed Dec 7, 2017Closed
- Implement routine or Web-accessible training or other outreach to improve how information is provided to railroad reporting officers and enhance their understanding of key reporting…DOT OIG ST2017045-2 · issued May 3, 2017 · closed Dec 7, 2017Closed
- Publish final rules for PRIIA grant programs that include clear, detailed directions for prospective applicants.DOT OIG CR2012072-3 · issued Mar 6, 2012 · closed Nov 1, 2017Closed
- Ensures that the State complies with special tests and provisions - wage rate requirements (Finding 2016-047).DOT OIG SA2017080-3 · issued Sep 11, 2017 · closed Oct 30, 2017Closed
- Develop and implement a plan to identify and regularly update a comprehensive list of entities regulated by FRA's bridge safety standards.DOT OIG ST2016059-2 · issued Apr 21, 2016 · closed Aug 7, 2017Closed
- Ensure the Academy complies with the Subrecipients Monitoring Requirements.DOT OIG SA2017033-3 · issued Mar 28, 2017 · closed Jul 31, 2017Closed
- Direct USRC to perform a full structural analysis on the building's structural components.DOT OIG FI2014033-5b · issued Apr 1, 2014 · closed Jul 28, 2017Closed
- Ensure that Amtrak complies with Equipment and Real Property Management Requirements.DOT OIG SA2017041-1 · issued Apr 24, 2017 · closed Jul 27, 2017Closed
- KPMG recommends that DOT follow established policies and procedures designed to prevent Anti-Deficiency Act violation.DOT OIG QC2017013-16 · issued Nov 15, 2016 · closed Mar 2, 2017Closed
- KPMG recommend that DOT increase training and communications with personnel responsible for performing the established policies and procedures.DOT OIG QC2017013-17 · issued Nov 15, 2016 · closed Mar 2, 2017Closed
- Require the Office of Railroad Safety to periodically perform a comprehensive hazardous materials transportation risk assessment that identifies and assesses the relationship among the…DOT OIG ST2016020-1 · issued Feb 24, 2016 · closed Feb 28, 2017Closed
- Issue guidance to regions that provides detailed information on the tools available to guide resource allocation decisions and the data feeding each tool, and sets expectations for how…DOT OIG ST2016020-2 · issued Feb 24, 2016 · closed Feb 28, 2017Closed
- Require the Office of Chief Counsel to provide to regional hazardous materials specialists an annual report or regular access to information on penalty amounts for each violation in closed…DOT OIG ST2016020-6 · issued Feb 24, 2016 · closed Feb 28, 2017Closed
- Ensure the State complies with the Special Tests and Provisions Requirements.DOT OIG SA2016082-1 · issued Aug 5, 2016 · closed Feb 1, 2017Closed
- Ensure the State complies with the Reporting Requirements (Finding 2015-073).DOT OIG SA2016107-9 · issued Sep 19, 2016 · closed Feb 1, 2017Closed
- Develop, document, and implement user and system-level data backup processes for the FRA Railroad Safety Information System.DOT OIG FI2016024-2 · issued Mar 3, 2016 · closed Jan 30, 2017Closed
- Conduct annual functional contingency plan testing for the FRA Railroad Safety Information System.DOT OIG FI2016024-7 · issued Mar 3, 2016 · closed Jan 30, 2017Closed
- Ensure the State complies with the Special Tests and Provisions Requirements (Finding 2015-021).DOT OIG SA2016084-2 · issued Aug 5, 2016 · closed Nov 28, 2016Closed
- Issue guidance for specialists to implement a data-driven, risk-based methodology for prioritizing bridge safety reviews.DOT OIG ST2016059-1 · issued Apr 21, 2016 · closed Nov 9, 2016Closed
- Develop new FRA Secure Site reports or other tools that meet hazardous materials inspectors' needs for access to inspection data from other regions and provide training on their use.DOT OIG ST2016020-3 · issued Feb 24, 2016 · closed Oct 20, 2016Closed
- Update guidance to inspectors on writing violation reports to include detailed information on how and when to recommend a penalty that differs from the guidelines and what to include in…DOT OIG ST2016020-4 · issued Feb 24, 2016 · closed Oct 19, 2016Closed
- Issue guidance that defines how bridge safety specialists should conduct their oversight reviews.DOT OIG ST2016059-3 · issued Apr 21, 2016 · closed Oct 17, 2016Closed
- Issue guidance that defines how bridge safety specialists should track and follow-up on identified issues of regulatory non-compliance to verify that owners take remedial actions.DOT OIG ST2016059-5 · issued Apr 21, 2016 · closed Oct 17, 2016Closed
- KPMG recommended that DOT complete the investigation into potential additional Anti-Deficiency Act violations at the FRA.DOT OIG QC2015011-10 · issued Nov 17, 2014 · closed Sep 27, 2016Closed
- KPMG recommended that DOT complete the investigation into potential additional Anti-Deficiency Act violations at the FRA.DOT OIG QC2016008-6 · issued Nov 16, 2015 · closed Sep 27, 2016Closed
- KPMG recommended that DOT implement appropriate policies and procedures to prevent future violations.DOT OIG QC2016008-7 · issued Nov 16, 2015 · closed Sep 27, 2016Closed
- Strengthen Office of Chief Counsel procedures for processing penalties at the penalty assessment stage to require attorneys to document their considerations of the penalty assessment…DOT OIG ST2016020-5 · issued Feb 24, 2016 · closed Sep 16, 2016Closed
- Ensure that Authority complies with the fixed charge coverage ratio Agreement with FRA.DOT OIG SA2016028-2 · issued Mar 8, 2016 · closed Jul 31, 2016Closed
- Ensure that Amtrak complies with the Equipment and Real Property Requirements.DOT OIG SA2016031-1 · issued Mar 8, 2016 · closed Jul 31, 2016Closed
- Ensure that Amtrak complies with Special Tests and Provisions Requirements.DOT OIG SA2016031-2 · issued Mar 8, 2016 · closed Jul 31, 2016Closed
- KPMG recommended that FRA revise its grant accrual retrospective review procedures to ensure that the retrospective review is performed at the appropriate level of precision to prevent…DOT OIG QC2016022-2 · issued Feb 25, 2016 · closed Jul 21, 2016Closed
- Complete the National Rail Plan and include in it measurable performance goals and clear stakeholder roles.DOT OIG CR2012072-2 · issued Mar 6, 2012 · closed Jun 7, 2016Closed
- Require that bridge safety specialists report all instances of regulatory non-compliance in their reviews as defects.DOT OIG ST2016059-4 · issued Apr 21, 2016 · closed May 20, 2016Closed
- Issue guidance that defines when and how bridge safety specialists should recommend civil penalties for non-compliance with Bridge Safety Standards.DOT OIG ST2016059-6 · issued Apr 21, 2016 · closed May 20, 2016Closed
- Amend Agency policy and procedures to require all staff, including inspectors, to directly report to OIG all suspected criminal violations and instances of fraud, waste, and abuse.DOT OIG ST2016020-7 · issued Feb 24, 2016 · closed May 9, 2016Closed
- That the Secretary and the Federal Railroad Administrator, or their designees, as Chair and member of the Union Station Redevelopment Corporation Board of Directors pursue actions to:…DOT OIG FI2014033-2 · issued Apr 1, 2014 · closed Mar 7, 2016Closed
- Define and communicate the extent of FRA's authority in the authority having jurisdiction (AHJ) role to the appropriate parties; designate individuals or offices within FRA to assume…DOT OIG FI2014033-4 · issued Apr 1, 2014 · closed Mar 7, 2016Closed
- That the Secretary and the Federal Railroad Administrator, or their designees, as Chair and member of the Union Station Redevelopment Corporation Board of Directors pursue actions to…DOT OIG FI2014033-1 · issued Apr 1, 2014 · closed Sep 29, 2015Closed
- That the Secretary and the Federal Railroad Administrator, or their designees, as Chair and member of the Union Station Redevelopment Corporation Board of Directors pursue actions to…DOT OIG FI2014033-3 · issued Apr 1, 2014 · closed Jul 30, 2015Closed
- Direct USRC to conduct a building assessment to identify and quantify deficiencies on nonstructural components.DOT OIG FI2014033-5a · issued Apr 1, 2014 · closed Jul 30, 2015Closed
- Complete a comprehensive set of standard operating procedures for internal staff administering the Agency's NEPA process.DOT OIG CR2014010-2 · issued Dec 5, 2013 · closed Feb 10, 2015Closed
- Develop a comprehensive action plan, including milestones, to complete all outstanding PRIIA responsibilities.DOT OIG CR2012072-1 · issued Mar 6, 2012 · closed Aug 29, 2012Closed
- Confirm the National Rail Cooperative Research Program's advisory board membership and ensure that the members act in a timely manner to initiate required research.DOT OIG CR2012072-4 · issued Mar 6, 2012 · closed Mar 6, 2012Closed