AuditLine › DOT OIG › Federal Aviation Administration
DOT OIG recommendation AV2013099-4
Conduct a comprehensive assessment of the staffing model as compared to the NRC recommendations, assess the quality of the data in the model and…
The recommendation, in the publisher's words
Conduct a comprehensive assessment of the staffing model as compared to the NRC recommendations, assess the quality of the data in the model and identify the steps needed to make the staffing model more viable.
- Responsible agency
- Federal Aviation Administration
- Issued
- June 20, 2013
- Report
- FAA Lacks a Reliable Model for Determining the Number of Flight Standards Safety Inspectors It Needs (AV2013099) · find it at DOT OIG
- Closed
- April 29, 2020 (publisher's date)
“Open” and “closed” are the publisher's words. AuditLine repeats them with the date it read them. It does not check whether a recommendation was carried out, and a closed recommendation is not proof that a problem was fixed.
Dated history
- Issued by DOT OIG. (publisher's date)
- Closed, with status “Closed”. (publisher's date)
- First recorded by AuditLine. (start of AuditLine's own history for this record)
Dates marked "publisher's date" come from the publisher's file. AuditLine's own observations begin November 10, 2026 and are added each time the publisher's file changes.
Other recommendations from this report
6 more, of which 0 are open in the publisher's file.
- Develop a plan with milestones to address the model's shortcomings and regularly report progress relative to plan milestones.DOT OIG AV2013099-1 · issued Jun 20, 2013 · closed Aug 15, 2015Closed
- Conduct and document a variance analysis of each model's results and assess staffing at field offices where the on-board staffing level varies widely from the current model projection to…DOT OIG AV2013099-2 · issued Jun 20, 2013 · closed Mar 27, 2025Closed
- Verify inspectors are following existing guidance to update and maintain the accuracy of databases prior to running iterations of the staffing model.DOT OIG AV2013099-3 · issued Jun 20, 2013 · closed Apr 29, 2020Closed
- Implement comprehensive and recurrent training for managers and inspectors on the staffing model.DOT OIG AV2013099-5 · issued Jun 20, 2013 · closed Jan 11, 2017Closed
- Establish a comprehensive analyst training program with guidance clarifying their roles, responsibilities, and training needs and establish a method to determine an appropriate number of…DOT OIG AV2013099-6 · issued Jun 20, 2013 · closed Dec 15, 2020Closed
- Clarify requirements and develop a process to ensure completion of training on specific air carrier policies and procedures for inspectors who participate in the geographic surveillance…DOT OIG AV2013099-7 · issued Jun 20, 2013 · closed Feb 3, 2014Closed
Source
Open this report in DOT OIG's tracker This publisher's records (CSV)
Official export: https://www.oig.dot.gov/recommendation-dashboard/export?page&_format=csv. File read , 3,436 rows,
SHA-256 6406a142cdf501ec…. DOT OIG's status and dollar figures are the publisher's own claims. Recommendations it marks sensitive are listed without their text.