AuditLine › DOT OIG › Federal Aviation Administration
DOT OIG recommendation AV2015112-6
Develop an implementation plan and quantify all costs required for the implementation of each recommendation in FAA’s 30-day Review of Contingency…
The recommendation, in the publisher's words
Develop an implementation plan and quantify all costs required for the implementation of each recommendation in FAA’s 30-day Review of Contingency Plans.
- Responsible agency
- Federal Aviation Administration
- Issued
- September 29, 2015
- Report
- FAA’s Contingency Plans and Security Protocols Were Insufficient at Chicago Air Traffic Control Facilities (AV2015112) · find it at DOT OIG
- Closed
- May 17, 2021 (publisher's date)
“Open” and “closed” are the publisher's words. AuditLine repeats them with the date it read them. It does not check whether a recommendation was carried out, and a closed recommendation is not proof that a problem was fixed.
Dated history
- Issued by DOT OIG. (publisher's date)
- Closed, with status “Closed”. (publisher's date)
- First recorded by AuditLine. (start of AuditLine's own history for this record)
Dates marked "publisher's date" come from the publisher's file. AuditLine's own observations begin November 10, 2026 and are added each time the publisher's file changes.
Other recommendations from this report
6 more, of which 0 are open in the publisher's file.
- Apply the lessons learned from the Chicago Center incident to the redesign of operational contingency plans for all Center facilities.DOT OIG AV2015112-1 · issued Sep 29, 2015 · closed Aug 24, 2016Closed
- Identify and implement changes needed to improve annual contingency training exercises to simulate more realistic scenarios.DOT OIG AV2015112-2 · issued Sep 29, 2015 · closed Feb 12, 2024Closed
- Evaluate the feasibility and cost of physically separating primary and backup components of critical communication infrastructure when comparing alternative implementation options for all…DOT OIG AV2015112-3 · issued Sep 29, 2015 · closed Sep 27, 2018Closed
- Install a secure wireless network that can provide access to FAA's local area network (LAN) and connectivity to the internet at Center facilities.DOT OIG AV2015112-4 · issued Sep 29, 2015 · closed Sep 2, 2020Closed
- Assess the feasibility and cost of replacing the existing fire suppression systems in critical equipment areas with a waterless system at Center facilities.DOT OIG AV2015112-5 · issued Sep 29, 2015 · closed Apr 19, 2016Closed
- Develop an implementation plan and quantify all costs required for the implementation of the 42 recommendations derived from the Comprehensive Security Review.DOT OIG AV2015112-7 · issued Sep 29, 2015 · closed Sep 21, 2016Closed
Source
Open this report in DOT OIG's tracker This publisher's records (CSV)
Official export: https://www.oig.dot.gov/recommendation-dashboard/export?page&_format=csv. File read , 3,436 rows,
SHA-256 6406a142cdf501ec…. DOT OIG's status and dollar figures are the publisher's own claims. Recommendations it marks sensitive are listed without their text.