DOT OIG recommendations · Department of Transportation
Federal Highway Administration
64 open and 338 closed recommendations from DOT Office of Inspector General name this office as responsible, in the publisher's own file.
Source: DOT OIG Recommendation Dashboard, official export read .
64openpublisher's status
338closedall closed statuses
20open five years or morecounted from the issue date
Apr 27, 2017oldest open, issued
| Publisher's status | Recommendations |
|---|---|
| Closed | 338 |
| Open | 64 |
“Open” and “closed” are the publisher's words. AuditLine repeats them with the date it read them. It does not check whether a recommendation was carried out, and a closed recommendation is not proof that a problem was fixed.
Open recommendations, oldest first
- Ensure the Tribe complies with Procurement, Suspension and Debarment Requirements.DOT OIG SA2017044-1 · issued Apr 27, 2017Open
- Recover $25,646 from the Tribe, if applicable.DOT OIG SA2017044-2 · issued Apr 27, 2017Open
- Ensures that the Tribe complies with activities allowed or unallowed and allowable costs/cost principles requirements.DOT OIG SA2017095-1 · issued Sep 11, 2017Open
- Determine an amount of questioned costs and recover from the Tribe, if applicable.DOT OIG SA2017095-2 · issued Sep 11, 2017Open
- Revise the Emergency Relief Manual to include a definition of resilience improvement and identify procedures States should use to incorporate resilience into ERP-funded projects.DOT OIG ST2018014-1 · issued Jan 10, 2018Open
- Develop and implement a process to track the consideration of resilience improvements for emergency relief projects and their associated costs.DOT OIG ST2018014-3 · issued Jan 10, 2018Open
- Ensures that the State complies with the special tests and provisions requirements.DOT OIG SA2018079-6 · issued Sep 10, 2018Open
- Ensures that the Tribe complies with the cash management requirements.DOT OIG SA2018085-1 · issued Sep 10, 2018Open
- Recovers $3,077,574 from the Tribe, if applicable.DOT OIG SA2018085-2 · issued Sep 10, 2018Open
- Ensures that the Tribe complies with the activities allowed/allowable costs and cost principles requirements.DOT OIG SA2018085-3 · issued Sep 10, 2018Open
- Recovers $22,691 from the Tribe, if applicable.DOT OIG SA2018085-4 · issued Sep 10, 2018Open
- Ensures that the Tribe complies with the equipment and real property requirements.DOT OIG SA2018085-5 · issued Sep 10, 2018Open
- Ensures that the Tribe complies with the period of performance requirements.DOT OIG SA2018085-6 · issued Sep 10, 2018Open
- Ensures that the Tribe complies with the special tests and provisions requirements.DOT OIG SA2018085-7 · issued Sep 10, 2018Open
- Ensures that the Commonwealth complies with the equipment and real property management requirements.DOT OIG SA2018094-1 · issued Sep 11, 2018Open
- Ensures that the Tribe complies with the procurement and suspension and debarment requirements.DOT OIG SA2019017-1 · issued Feb 13, 2019Open
- We recommend that FHWA recovers $1,531,442 from the Tribe, if applicable.DOT OIG SA2019017-2 · issued Feb 13, 2019Open
- Ensures that the Council complies with the activities allowed or unallowed requirements.DOT OIG SA2019068-1 · issued Sep 10, 2019Open
- Recovers $194,821 from the Council, if applicable.DOT OIG SA2019068-2 · issued Sep 10, 2019Open
- Ensures that the Council complies with the procurement and suspension and debarment requirements.DOT OIG SA2019071-1 · issued Sep 10, 2019Open
- Direct the Office of Infrastructure to follow the FHWA Emergency Relief (ER) Manual regarding deallocations of unobligated funds.DOT OIG FS2022022-1 · issued Feb 15, 2022Open
- Update the ER Manual's quick release procedures to clarify the documentation needed for funding approval and the responsibilities to maintain sufficient evidence of required approvals for…DOT OIG FS2022022-3 · issued Feb 15, 2022Open
- Update the ER Manual to incorporate the requirements in FHWA Order 5182.1, including the routine review of unobligated balances so that funds can be deallocated when no longer needed.DOT OIG FS2022022-5 · issued Feb 15, 2022Open
- Enhance the Fiscal Management Information System or develop an agency-wide data management process to provide FHWA personnel with access to change order information for performing their…DOT OIG ST2022031-1 · issued Jul 20, 2022Open
- Evaluate and revise as necessary the Agency processes, including Compliance Assessment Program reviews, to include an oversight methodology that can generate accurate, statistically valid,…DOT OIG ST2022031-2 · issued Jul 20, 2022Open
- Develop and implement guidance for use by FHWA and States that a. includes a consistent definition of "change order," b. delineates the differences between a major change and a significant…DOT OIG ST2022031-3 · issued Jul 20, 2022Open
- Update FHWA's Contract Administration Core Curriculum Manual, dated October 2014, to clearly reflect that FHWA may assign its change order approval responsibilities to State DOTs through…DOT OIG ST2022031-4 · issued Jul 20, 2022Open
- Revise the October 2015 guidance on structures subject to the national tunnel inspection standards to clarify which structures align with the definition of a tunnel and explain how…DOT OIG ST2023012-1 · issued Jan 17, 2023Open
- As part of the next update to the tunnel safety program compliance review manual, solicit and consider external stakeholder input on the Agency’s review procedures to include States,…DOT OIG ST2023012-10 · issued Jan 17, 2023Open
- Update the guidance for the national critical findings database to clarify its scope and incorporate comprehensive controls for ensuring the quality of the reported data. Solicit external…DOT OIG ST2023012-11 · issued Jan 17, 2023Open
- Issue guidance for FHWA Divisions on how to verify that State DOTs, Federal agencies, and tribal governments have reported all highway tunnels to the national tunnel inventory; and for…DOT OIG ST2023012-2 · issued Jan 17, 2023Open
- Assess the process for conducting compliance reviews of other Federal agencies and implement any recommended changes to ensure the reviews are effectively staffed and sufficiently…DOT OIG ST2023012-7 · issued Jan 17, 2023Open
- Update the tunnel safety program compliance review manual to incorporate existing review process flexibilities, such as when unusual or unique circumstances impact tunnel inspection…DOT OIG ST2023012-9 · issued Jan 17, 2023Open
- Advise WSDOT as part of stewardship and oversight activities to include change orders in WSDOT's next project management review of SDOT.DOT OIG ZA2023014-4 · issued Feb 1, 2023Open
- KPMG recommends that FHWA management consider the increased IIJA funding and subsequent increase in expenses and develop an estimation methodology responsive to fluctuations in future…DOT OIG QC2024007-2 · issued Nov 15, 2023Open
- Provide FHWA Division Offices and State DOTs with all planned IIJA guidance areas and associated targeted completion dates.DOT OIG ST2024021-1 · issued Apr 1, 2024Open
- Identify a list of any outstanding technical assistance requests from Division Offices and State DOTs for IIJA guidance clarifications and fulfill them.DOT OIG ST2024021-2 · issued Apr 1, 2024Open
- FHWA to enforce DOT security policy for removal of default credentials and harden the device configurations for all identified compromised devices and devices that could be similarly…DOT OIG IT2025012-7 · issued Nov 25, 2024Open
- FHWA to conduct incident response exercises with appropriate personnel that test the retrieval of security audit logs in the event of an incident.DOT OIG IT2025012-8 · issued Nov 25, 2024Open
- KPMG recommends that FHWA management clearly and consistently communicate change management requirements per the FHWA Configuration and Change Management Process policy to the control…DOT OIG QC2025015-1 · issued Jan 29, 2025Open
- KPMG recommends that FHWA management develop an estimation methodology responsive to fluctuations in future expenses.DOT OIG QC2025015-11 · issued Jan 29, 2025Open
- Establish requirements for complete and current Division approvals of State Department of Transportation (State DOT) construction quality assurance programs.DOT OIG ST2025022-1 · issued Feb 18, 2025Open
- Update the Agency's webpage on detecting and reporting fraud in consultation with the Office of Inspector General to correct inaccurate and out-of-date information.DOT OIG ST2025022-10 · issued Feb 18, 2025Open
- Develop and implement an Agencywide construction quality assurance fraud risk strategy, with associated guidance and training, that Divisions can use to prevent, detect, and respond to…DOT OIG ST2025022-11 · issued Feb 18, 2025Open
- Update FHWA construction quality assurance related webpages to correct out-of-date information.DOT OIG ST2025022-12 · issued Feb 18, 2025Open
- Implement controls for maintaining current and complete construction quality assurance information on FHWA's website, including program office webpages and those on the Policy and Guidance…DOT OIG ST2025022-13 · issued Feb 18, 2025Open
- Implement controls to ensure that all applicable construction quality assurance program documents used on State DOT and locally-administered National Highway System (NHS) projects are…DOT OIG ST2025022-2 · issued Feb 18, 2025Open
- Require Divisions to develop and implement written procedures for conducting appropriate oversight of State DOT construction quality assurance programs and addressing the minimum oversight…DOT OIG ST2025022-3 · issued Feb 18, 2025Open
- Assess the project materials certifications related to the $24.3 million in questioned costs we identified. Develop an action plan to confirm that materials submitted under these…DOT OIG ST2025022-4 · issued Feb 18, 2025Open
- Develop and implement guidance for Divisions' review of materials certifications, including verification that certifications conform to required standards, and establish a uniform…DOT OIG ST2025022-5 · issued Feb 18, 2025Open
- Update the Agency's guidance on construction monitoring to establish minimum requirements for Divisions' oversight on construction inspection.DOT OIG ST2025022-6 · issued Feb 18, 2025Open
- Assess the risk of construction quality assurance on locally-administered NHS projects whose local agencies are direct recipients of Federal-aid funds and implement actions to mitigate…DOT OIG ST2025022-7 · issued Feb 18, 2025Open
- Update the Agency's construction quality assurance stewardship review process to address all aspects of compliance and Division oversight. The updated process should address the tracking…DOT OIG ST2025022-8 · issued Feb 18, 2025Open
- Update the Agency's construction quality assurance assessment process to incorporate a systematic assessment of fraud risks affecting the program.DOT OIG ST2025022-9 · issued Feb 18, 2025Open
- OIG recommends that OST work with the Federal Highway Administration to determine the allowability of questioned tribal transactions and recover $5,803,740, if applicable.DOT OIG SA2025024-3 · issued Feb 19, 2025Open
- Enhance oversight reviews to include greater focus on Buy America compliance.DOT OIG FI2025037-4 · issued Jul 28, 2025Open
- Direct FHWA's Office of Acquisition and Grants Management to revise language in the Acquisition Procurement Memorandum 009-G defining the level of detail direct recipients need to submit…DOT OIG FI2026004-1 · issued Dec 17, 2025Open
- Require FHWA's Office of Acquisition and Grants Management to obtain detailed support for the $1.9 million in unsupported costs we identified in this report, seek recovery from the…DOT OIG FI2026004-2 · issued Dec 17, 2025Open
- Strengthen FHWA's process to validate that State Department of Transportation (DOT) ATCMTD reimbursement requests comply with Federal regulations.DOT OIG FI2026004-3 · issued Dec 17, 2025Open
- Strengthen FHWA's process to evaluate that State DOTs have demonstrated how they will carry out financial oversight responsibilities for ATCMTD grants in accordance with their Stewardship…DOT OIG FI2026004-4 · issued Dec 17, 2025Open
- Strengthen FHWA's process to evaluate that State DOTs maintain supporting documentation for ATCMTD reimbursements upon FHWA's request as required in their Stewardship and Oversight…DOT OIG FI2026004-5 · issued Dec 17, 2025Open
- FHWA management enforce the FHWA Configuration and Change Management Process to ensure that approvals and documentation related to application changes ae completed in accordance with the…DOT OIG QC2026019-1 · issued Feb 25, 2026Open
- FHWA management enforce the change management requirements per the DOT Compendium and the FHWA Configuration and Change Management Process policy to ensure testing and approvals are…DOT OIG QC2026019-2 · issued Feb 25, 2026Open
- FHWA management further refine and enhance their estimation methodology to ensure it remains responsive to future expense fluctuations, including conducting a timely comprehensive risk…DOT OIG QC2026019-7 · issued Feb 25, 2026Open
Closed recommendations, most recently closed first
- Issue best practices for Buy America materials certification, including standardized templates which detail required data fields, such as identifying project information.DOT OIG FI2025037-1 · issued Jul 28, 2025 · closed Nov 12, 2026Closed
- Update guidance for FHWA's minimal use threshold, including the definition of “total contract cost.”DOT OIG FI2025037-2 · issued Jul 28, 2025 · closed Nov 12, 2026Closed
- For the $594,000 in questioned costs relating to Seattle Department of Transportation's West Seattle Bridge project, review materials certification documents relating to cathodic…DOT OIG FI2025037-3 · issued Jul 28, 2025 · closed Nov 12, 2026Closed
- Increase awareness of Buy America requirements to include documenting certification of shop and field welding consumables and processes.DOT OIG FI2025037-5 · issued Jul 28, 2025 · closed Nov 12, 2026Closed
- For the $160,336 in questioned costs related to Texas Department of Transportation's (TxDOT) I-10 and I-35 projects, work with TxDOT to confirm Buy America compliance for those foreign…DOT OIG FI2025037-6 · issued Jul 28, 2025 · closed Nov 12, 2026Closed
- Direct the FHWA WA Division to review WSDOT's established process of reviewing subrecipients' supporting documentation for internal staffing charges (e.g., billing records, invoices,…DOT OIG ZA2023014-5 · issued Feb 1, 2023 · closed Sep 22, 2026Closed
- KPMG recommends that FHWA management review and update accounting policies and operating procedures to capitalize costs for the construction and procurement of non-heritage fixed assets on…DOT OIG QC2024007-3 · issued Nov 15, 2023 · closed Sep 11, 2026Closed
- KPMG recommends that FHWA management establish and maintain communications channels with FLMA partners and establish protocols for communicating asset-level detail for projects required by…DOT OIG QC2024007-4 · issued Nov 15, 2023 · closed Sep 11, 2026Closed
- KPMG recommends that FHWA management perform an assessment of costs expensed for completed fixed asset construction projects to determine materiality and record correcting accounting…DOT OIG QC2024007-5 · issued Nov 15, 2023 · closed Sep 11, 2026Closed
- KPMG recommends that FHWA management review and update accounting policies and operating procedures to capitalize costs for the construction and procurement of non-heritage fixed assets on…DOT OIG QC2025015-2 · issued Jan 29, 2025 · closed Aug 3, 2026Closed
- KPMG recommends that FHWA management establish and maintain communications channels with FLMA partners of other ongoing projects and establish protocols for communicating asset-level…DOT OIG QC2025015-3 · issued Jan 29, 2025 · closed Aug 3, 2026Closed
- KPMG recommends that FHWA management complete performance of an assessment of costs expensed for completed fixed asset construction projects to determine materiality and record remaining…DOT OIG QC2025015-4 · issued Jan 29, 2025 · closed Aug 3, 2026Closed
- Ensure that the Government complies with the Equipment and Real Property Management Requirements.DOT OIG SA2017038-1 · issued Mar 28, 2017 · closed Feb 25, 2026Closed
- Ensures that the Government complies with equipment and real property management requirements.DOT OIG SA2017091-1 · issued Sep 11, 2017 · closed Feb 25, 2026Closed
- Develop and implement a process for periodically assessing force account risk. Based on the risk assessment, develop and implement procedures for overseeing compliance with Federal force…DOT OIG ST2019053-1 · issued May 29, 2019 · closed Sep 19, 2025Closed
- Revise force account guidance for the States to clarify when cost-effectiveness determinations are required.DOT OIG ST2019053-2 · issued May 29, 2019 · closed Sep 19, 2025Closed
- Develop and implement a process for determining when force account can be used for work performed outside the Federal highway right-of-way without complying with Federal requirements.DOT OIG ST2019053-4 · issued May 29, 2019 · closed Aug 7, 2025Closed
- Develop and implement a policy to require Headquarters' concurrence when Division Offices are making procedural revisions to their standard operating procedures for reviewing and approving…DOT OIG ST2024021-3 · issued Apr 1, 2024 · closed Jul 31, 2025Closed
- Develop and implement internal guidance for the Agency's Program Review Library to clearly define the terms "formal report" and "substantive report."DOT OIG ST2022031-5 · issued Jul 20, 2022 · closed Mar 24, 2025Closed
- Establish clear roles and responsibilities to verify that FHWA Division Offices monitor and track their reports and associated findings and recommendations related to change orders.DOT OIG ST2022031-6 · issued Jul 20, 2022 · closed Mar 24, 2025Closed
- Amend FHWA guidance to recommend that State DOTs conduct frequent, regular, systematic reviews of procurements made over multiple years using specific statistics to identify…DOT OIG EC2025019-1 · issued Feb 12, 2025 · closed Mar 20, 2025Closed
- Ensures that the State complies with the special tests and provisions requirements.DOT OIG SA2019066-1 · issued Sep 10, 2019 · closed Sep 30, 2024Closed
- Recovers $466,262 from the State, if applicable.DOT OIG SA2017073-2 · issued Aug 9, 2017 · closed Sep 26, 2024Closed
- Communicate noteworthy practices on the critical findings process for tunnels and work with stakeholders to improve the guidance on which structural and safety deficiencies align with the…DOT OIG ST2023012-12 · issued Jan 17, 2023 · closed Sep 25, 2024Closed
- Implement comprehensive procedures on the processing and publishing of national tunnel inventory data, including controls to reduce data errors.DOT OIG ST2023012-3 · issued Jan 17, 2023 · closed Aug 8, 2024Closed
- Work with WSDOT to collect adequate supporting documentation for $753,839 in internal staffing costs identified by OIG or recover from WSDOT any portion that is determined to be…DOT OIG ZA2023014-6 · issued Feb 1, 2023 · closed Jul 30, 2024Closed
- Identify feasible improvements to the presentation of national tunnel inventory data on the Agency’s website to facilitate the public’s understanding and use of the data, and develop a…DOT OIG ST2023012-5 · issued Jan 17, 2023 · closed Jun 26, 2024Closed
- Document the quality control and quality assurance processes, incorporate controls to ensure that all tunnel program compliance determinations adhere to the applicable compliance criteria,…DOT OIG ST2023012-6 · issued Jan 17, 2023 · closed Jun 26, 2024Closed
- Implement minimum training requirements for FHWA staff responsible for conducting tunnel safety program compliance reviews.DOT OIG ST2023012-8 · issued Jan 17, 2023 · closed Dec 22, 2023Closed
- Recover the $176,029.71 in unallowable emergency relief payments identified in this report.DOT OIG FS2022022-6 · issued Feb 15, 2022 · closed Dec 15, 2023Closed
- Revise and issue guidance to communicate to FHWA staff and stakeholders the processes FHWA will use to take Federal stewardship considerations into account in approving P3 projects. This…DOT OIG ST2019019-2 · issued Mar 6, 2019 · closed Nov 14, 2023Closed
- Develop and issue guidance to internal and external stakeholders communicating the processes FHWA will use to oversee P3 projects, including during the Operations and Maintenance phase for…DOT OIG ST2019019-5 · issued Mar 6, 2019 · closed Nov 14, 2023Closed
- Issue a report to Congress on the national tunnel inventory and consult with the relevant Congressional committees about the intent of the statutory provision to provide subsequent annual…DOT OIG ST2023012-4 · issued Jan 17, 2023 · closed Nov 13, 2023Closed
- Recovers $3,644,218 from the State, if applicable.DOT OIG SA2019041-2 · issued Mar 26, 2019 · closed Sep 29, 2023Closed
- Develop performance measures that track compliance with the 10-year limit and report progress.DOT OIG ST2016095-6 · issued Aug 26, 2016 · closed Sep 27, 2023Closed
- For the $143 million in PE projects questioned in this report without adequate justification for time extensions or avoided repayments, obtain from the States appropriate support or…DOT OIG ST2016095-7 · issued Aug 26, 2016 · closed Sep 27, 2023Closed
- Remove $21 million in lapsed funding identified in this report from FHWA’s unobligated balances. Implementing this recommendation could put $21 million in funds to better use on other…DOT OIG ZA2023014-3 · issued Feb 1, 2023 · closed Sep 26, 2023Closed
- Ensure the Shoshone and Arapaho Tribes comply with the Special Tests and Provisions Requirements.DOT OIG SA2016051-1 · issued Mar 16, 2016 · closed Jul 21, 2023Closed
- Identify any balance of allocated quick release funds older than 6 months, that will not be obligated through the remainder of the fiscal year and that are no longer needed, including the…DOT OIG FS2022022-2 · issued Feb 15, 2022 · closed Apr 3, 2023Closed
- Instruct the FHWA Texas Division to coordinate with the Texas DOT to deobligate the funds the State no longer needs, as discussed in this report. Implementation of this recommendation…DOT OIG FS2022022-4 · issued Feb 15, 2022 · closed Apr 3, 2023Closed
- Ensure the Tribe complies with Procurement, Suspension and Debarment requirements.DOT OIG SA2013111-1 · issued Jul 12, 2013 · closed Mar 31, 2023Closed
- Ensures that the Commonwealth complies with the subrecipient monitoring requirements.DOT OIG SA2019076-1 · issued Sep 17, 2019 · closed Mar 31, 2023Closed
- Recovers $2,877,461 from the State, if applicable.DOT OIG SA2019041-4 · issued Mar 26, 2019 · closed Mar 27, 2023Closed
- Consult with the Build America Bureau to define FHWA’s and the Bureau’s roles and responsibilities during the Operations and Maintenance phase for P3 projects.DOT OIG ST2019019-4 · issued Mar 6, 2019 · closed Dec 15, 2022Closed
- Develop and issue Agencywide guidance identifying risks specific to P3 projects that Division Offices should consider in their risk assessments of State and local transportation agencies’…DOT OIG ST2019019-3 · issued Mar 6, 2019 · closed Nov 1, 2022Closed
- Ensures that the Authority complies with the matching requirements.DOT OIG SA2018069-3 · issued Aug 15, 2018 · closed Sep 30, 2022Closed
- Ensures that the Authority complies with the matching requirements.DOT OIG SA2019069-2 · issued Sep 10, 2019 · closed Sep 30, 2022Closed
- Establish standard FHWA Division Office requirements for performing and documenting oversight of State contracting activity, including stewardship agreement requirements for (a) FHWA…DOT OIG ZA2012084-5 · issued Apr 5, 2012 · closed Jun 16, 2022Closed
- Recover the unallowed excecutive compensation costs and other unallowable expenses identified in this audit - $2.8 million in unallowable executive compensation and $1.6 million in other…DOT OIG ZA2009033-3 · issued Feb 5, 2009 · closed Jun 9, 2022Closed
- By implementing the recommendations in this report, FHWA could put approximately $30.2 million in future Federal-aid funds to better use.DOT OIG ZA2009033-5 · issued Feb 5, 2009 · closed Jun 7, 2022Closed
- Ensure the Council complies with the Allowable Costs/Cost Principles Requirements.DOT OIG SA2016053-1 · issued Mar 16, 2016 · closed May 23, 2022Closed
- Ensures that the State complies with procurement and suspension and debarment requirements.DOT OIG SA2017073-1 · issued Aug 9, 2017 · closed May 23, 2022Closed
- Ensures that the State complies with special tests and provisions requirements.DOT OIG SA2017073-3 · issued Aug 9, 2017 · closed May 23, 2022Closed
- Develop and implement a process to routinely monitor the implementation and evaluate the effectiveness of FHWA’s risk-based project involvement.DOT OIG ST2020035-8 · issued May 19, 2020 · closed May 9, 2022Closed
- Recover $255,941 from the Council, if applicable.DOT OIG SA2016053-2 · issued Mar 16, 2016 · closed May 5, 2022Closed
- KPMG recommends FHWA management enforce the Manage Log Review Files SOP or similar procedure that requires the Windows System Administrator to review Grant Management Application/UPACS…DOT OIG QC2020025-11 · issued Apr 8, 2020 · closed Apr 20, 2022Closed
- KPMG recommends FHWA management ensure that System Administrators (SA) or Database Administrators (DBA) review past Grant Management Application/UPACS operating system log records for…DOT OIG QC2020025-12 · issued Apr 8, 2020 · closed Apr 20, 2022Closed
- KPMG recommends FHWA management enforce the Manage Log Review Files SOP or similar procedure that requires the System Administrators to review Grant Management Application/UPACS logs on a…DOT OIG QC2020025-13 · issued Apr 8, 2020 · closed Apr 20, 2022Closed
- KPMG recommends FHWA management ensure that System Administrators (SA) or Database Administrators (DBA) review past Grant Management Application/UPACS log records for completion. If SAs or…DOT OIG QC2020025-14 · issued Apr 8, 2020 · closed Apr 20, 2022Closed
- KPMG recommends that FHWA and ESC management design and implement a control that is sufficiently precise to detect and correct UDO reconciliation discrepancies in the correct fiscal year…DOT OIG QC2021015-14 · issued Jan 27, 2021 · closed Mar 16, 2022Closed
- KPMG recommends that FHWA management update its security documentation and system security plan, in accordance with Department requirements, to capture any control deviations and…DOT OIG QC2021015-8 · issued Jan 27, 2021 · closed Mar 16, 2022Closed
- Establish target completion dates for the remaining planned actions for MAP-21 Subtitle C provisions that are in progress.DOT OIG ST2017029-4 · issued Mar 6, 2017 · closed Mar 8, 2022Closed
- Mandate the confidentiality of potential and actual bidders' names and engineer's estimates, as currently recommended in FHWA's competitive bidding and contract award guidance.DOT OIG ZA2012084-2 · issued Apr 5, 2012 · closed Feb 28, 2022Closed
- Implement policies and procedures for ensuring that each State DOT establishes and uses a written, FHWA-approved plan for evaluating competition. These plans should address: assessing…DOT OIG ZA2012084-3 · issued Apr 5, 2012 · closed Feb 28, 2022Closed
- Develop and implement effective performance measures and metrics to assess and trend State DOT contract award practices, document concerns, and share best practices with other State DOTs.DOT OIG ZA2012084-4 · issued Apr 5, 2012 · closed Feb 28, 2022Closed
- Develop an action plan to collect and review the cost-effectiveness determinations for the 18 projects related to the $22.3 million in unsupported costs. Recover funds associated with…DOT OIG ST2019053-3 · issued May 29, 2019 · closed Jan 14, 2022Closed
- Ensures that the State complies with the subrecipient monitoring requirements.DOT OIG SA2018079-2 · issued Sep 10, 2018 · closed Jan 13, 2022Closed
- Ensure the Government of the U.S. Virgin Islands complies with Cash Management Requirements.DOT OIG SA2014081-1 · issued Aug 1, 2014 · closed Jan 11, 2022Closed
- Ensure the USVI complies with Cash Management Requirements.DOT OIG SA2014123-1 · issued Sep 17, 2014 · closed Jan 11, 2022Closed
- Update and issue a procedure within the Florida Division for conducting and documenting complete project risk assessments in accordance with FHWA's national guidance.DOT OIG ST2020035-3 · issued May 19, 2020 · closed Dec 15, 2021Closed
- Update and issue a procedure within the Florida Division for documenting complete risk-based project oversight plans in accordance with FHWA's national guidance.DOT OIG ST2020035-7 · issued May 19, 2020 · closed Dec 15, 2021Closed
- Require FHWA Headquarters and Division Offices to follow established procedures for reviewing and approving initial financial plans to ensure they include an assessment of the…DOT OIG ST2019019-1 · issued Mar 6, 2019 · closed Dec 9, 2021Closed
- Update FHWA’s Guidelines on Preparing Engineer’s Estimate, Bid Reviews, and Evaluation (2004 Guidance) to include: a. Estimating guidance for more recent project delivery methods, such as…DOT OIG ST2019020-2 · issued Mar 13, 2019 · closed Nov 30, 2021Closed
- Assess the validity and applicability of the threshold in FHWA's 2004 Guidance that is used to measure the accuracy of Engineer's Estimates.DOT OIG ST2019020-3 · issued Mar 13, 2019 · closed Nov 30, 2021Closed
- Develop and implement an oversight process for Engineer's Estimates that assesses whether States are following FHWA's guidance and thresholds.DOT OIG ST2019020-4 · issued Mar 13, 2019 · closed Nov 30, 2021Closed
- Ensures that the Government of Guam complies with equipment and real property management requirements.DOT OIG SA2017083-1 · issued Sep 11, 2017 · closed Nov 29, 2021Closed
- Ensures that Guam complies with the equipment and real property management requirements.DOT OIG SA2018074-1 · issued Aug 22, 2018 · closed Nov 29, 2021Closed
- Obtain a legal determination from the Office of the Secretary to permit SPES projects and similar funding agreements and establish internal controls to ensure compliance with Federal…DOT OIG ST2016095-4 · issued Aug 26, 2016 · closed Nov 2, 2021Closed
- Ensures that the Council complies with the cash management requirements.DOT OIG SA2018054-1 · issued May 2, 2018 · closed Sep 29, 2021Closed
- Recovers $666,482 from the Council, if necessary.DOT OIG SA2018054-2 · issued May 2, 2018 · closed Sep 29, 2021Closed
- Ensures that the State complies with the allowable costs/cost principles requirements.ÂDOT OIG SA2019070-1 · issued Sep 10, 2019 · closed Sep 22, 2021Closed
- We recommend that FHWA ensures that the Navajo Nation complies with the equipment and real property requirements.DOT OIG SA2018097-1 · issued Sep 12, 2018 · closed Sep 21, 2021Closed
- Enforce the requirement for Directors of Field Services to sign Agreements, as specified in FHWA’s Delegation and Organization Manual, or change the Delegation and Organization Manual to…DOT OIG MH2013001-4 · issued Oct 1, 2012 · closed Sep 17, 2021Closed
- Ensures that the State complies with the cash management requirements.DOT OIG SA2018079-1 · issued Sep 10, 2018 · closed May 26, 2021Closed
- KPMG recommends that FHWA Management revise its currentbi-weekly review process in coordination with Human Resources to ensure thatthe grants management application system owners remove…DOT OIG QC2020025-6 · issued Apr 8, 2020 · closed May 6, 2021Closed
- Ensure that the Government complies with the Special Tests and Provisions—Wage Rate Requirements.DOT OIG SA2017038-2 · issued Mar 28, 2017 · closed Apr 28, 2021Closed
- Ensure the Government of the U.S. Virgin Islands complies with Cash Management requirements.DOT OIG SA2013041-1 · issued Feb 12, 2013 · closed Apr 26, 2021Closed
- Ensures that the State complies with the cash management requirements.DOT OIG SA2019059-1 · issued Jul 31, 2019 · closed Apr 26, 2021Closed
- Ensures that the Government complies with Special tests and provisions-wage rate requirements.DOT OIG SA2017091-2 · issued Sep 11, 2017 · closed Apr 22, 2021Closed
- Recovers $1,023,224 from the State, if applicable.DOT OIG SA2019070-2 · issued Sep 10, 2019 · closed Apr 22, 2021Closed
- Recover $2,773,489 from the Tribe, if applicable.DOT OIG SA2016039-2 · issued Mar 11, 2016 · closed Apr 21, 2021Closed
- Ensures that the State complies with period of performance requirements.DOT OIG SA2019041-1 · issued Mar 26, 2019 · closed Apr 21, 2021Closed
- Ensures that the State complies with the special tests and provisions requirements.DOT OIG SA2019041-3 · issued Mar 26, 2019 · closed Apr 21, 2021Closed
- Ensures that the Council complies with the special tests and provisions requirements.DOT OIG SA2019071-3 · issued Sep 10, 2019 · closed Apr 21, 2021Closed
- Recover $17,190 from the Tribe, if applicable.DOT OIG SA2014045-1 · issued May 21, 2014 · closed Apr 20, 2021Closed
- Ensure the Tribe complies with the Cash Management Requirements.DOT OIG SA2016039-1 · issued Mar 11, 2016 · closed Apr 20, 2021Closed
- Ensures that the Wyoming DOT complies with the reporting requirements.DOT OIG SA2018063-1 · issued Aug 6, 2018 · closed Apr 19, 2021Closed
- Ensures that the Native Village complies with the reporting requirements.DOT OIG SA2019047-1 · issued Mar 27, 2019 · closed Apr 19, 2021Closed
- Recovers $252,644 from the State, if applicable.DOT OIG SA2017097-2 · issued Sep 11, 2017 · closed Apr 16, 2021Closed
- KPMG recommendes that FHWA strengthen policies and procedures to ensure that terminated users’ access is removed timely, in accordance with the DOT Cybersecurity Compendium guidelines.DOT OIG QC2017025-7 · issued Feb 7, 2017 · closed Mar 30, 2021Closed
- KPMG recommends FHWA strengthen policies and procedures to ensure that terminated users’ access is removed timely from UPACS and the application it supports, in accordance with the DOT…DOT OIG QC2018023-2 · issued Feb 12, 2018 · closed Mar 30, 2021Closed
- KPMG recommends that FHWA management develop a process to ensure the review of FMIS5 application access is completed by all divisions.DOT OIG QC2019024-5 · issued Mar 20, 2019 · closed Mar 30, 2021Closed
- KPMG recommends that FHWA management update the FMIS5 standard operating procedures or other appropriate documentation to reflect the new review process.DOT OIG QC2019024-6 · issued Mar 20, 2019 · closed Mar 30, 2021Closed
- KPMG recommends that FHWA management strengthen policies and procedures that require terminated user accounts to be removed from UPACS in a timely manner.DOT OIG QC2019024-7 · issued Mar 20, 2019 · closed Mar 30, 2021Closed
- KPMG recommends that FHWA management update the UPACS standard operating procedures documents to reflect the new requirements.DOT OIG QC2019024-8 · issued Mar 20, 2019 · closed Mar 30, 2021Closed
- KPMG recommends FHWA management update the SOP, to clearlydefine the UPACS audit log environment, log mechanisms, and frequency anddocumentation of the log reviews.DOT OIG QC2020025-10 · issued Apr 8, 2020 · closed Mar 30, 2021Closed
- KPMG recommends that FHWA develop and implement a process to notify appropriate authoritative personnel in the event that the division sponsor has not completed its user reviews timely…DOT OIG QC2020025-5 · issued Apr 8, 2020 · closed Mar 30, 2021Closed
- KPMG recommends that the FHWA determine the appropriate role for the grant management application user based on job function, and revoke user access to the incompatible role.DOT OIG QC2020025-7 · issued Apr 8, 2020 · closed Mar 30, 2021Closed
- KPMG recommends that the FHWA ensure that access policies and procedures regarding segregation of duties are enforced when granting users access to the grants management application via…DOT OIG QC2020025-8 · issued Apr 8, 2020 · closed Mar 30, 2021Closed
- KPMG recommends that the FHWA develop and implement a periodic review of access for the Database Administrators and Developers for the grants management application.DOT OIG QC2020025-9 · issued Apr 8, 2020 · closed Mar 30, 2021Closed
- Conduct an assessment of the accuracy and completeness of PE project authorizations. Correct any errors in FMIS projects that should be coded as PE as a result of this assessment.DOT OIG ST2016095-2 · issued Aug 26, 2016 · closed Mar 4, 2021Closed
- Update and implement FHWA's guidance for risk-based project involvement to clarify the requirements for its project risk-assessment process, including expectations for conducting and…DOT OIG ST2020035-1 · issued May 19, 2020 · closed Feb 22, 2021Closed
- Identify and notify Divisions about sources of information that can inform the project risk-assessment process, such as the quarterly reports required by the grant agreement for the…DOT OIG ST2020035-2 · issued May 19, 2020 · closed Feb 22, 2021Closed
- Update and implement FHWA's guidance for risk-based project involvement to clarify how the link between elevated risks and associated oversight activities, changes to oversight actions,…DOT OIG ST2020035-4 · issued May 19, 2020 · closed Feb 22, 2021Closed
- Develop and implement guidance for documenting, in risk-based project oversight plans and associated materials, the scope of FHWA's risk-based involvement, such as through the use of…DOT OIG ST2020035-5 · issued May 19, 2020 · closed Feb 22, 2021Closed
- Develop and implement guidance that establishes criteria for the content of risk-based project oversight plans to maintain consistency and avoid creating multiple redundant plans. Include…DOT OIG ST2020035-6 · issued May 19, 2020 · closed Feb 22, 2021Closed
- KPMG recommends that DOT Management perform a thorough and detailed review of the overall TIFIA cashflow model functionality and implementation to ensure that all assumptions areproperly…DOT OIG QC2019010-3 · issued Nov 15, 2018 · closed Dec 17, 2020Closed
- KPMG recommends that DOT consider automating the calculations that are performed manually to reduce risk of misapplication of assumptions due to human error.DOT OIG QC2019010-4 · issued Nov 15, 2018 · closed Dec 17, 2020Closed
- KPMG recommends that FHWA review the overall cash flow model functionality and implementation to ensure that all assumptions are properly applied, documented, and supported in the…DOT OIG QC2017013-14 · issued Nov 15, 2016 · closed Dec 16, 2020Closed
- KPMG recommends that FHWA consider automating the calculations that are performed manually to reduce the risk of misapplication of assumptions due to human error.DOT OIG QC2017013-15 · issued Nov 15, 2016 · closed Dec 16, 2020Closed
- KPMG recommends that DOT review the overall cash flow model functionality and implementation to ensure that all assumptions are properly applied, documented, and supported in the execution…DOT OIG QC2018008-6 · issued Nov 15, 2017 · closed Dec 16, 2020Closed
- KPMG recommends that DOT consider automating the calculations that are performed manually to reduce the risk of misapplication of assumptions due to human error.DOT OIG QC2018008-7 · issued Nov 15, 2017 · closed Dec 16, 2020Closed
- Recover $199,333 from the Tribe, if applicable.DOT OIG SA2013111-2 · issued Jul 12, 2013 · closed Sep 24, 2020Closed
- Recover $74,746 from the Authority, if applicable.DOT OIG SA2019034-3 · issued Mar 27, 2019 · closed Sep 24, 2020Closed
- Ensures that the State complies with the special tests and provisions reqirements.DOT OIG SA2018046-1 · issued May 3, 2018 · closed Sep 21, 2020Closed
- Conduct an assessment of the risks and existing controls associated with the Division Offices' oversight of State's processes to track PE projects, and identify improvements to Division…DOT OIG ST2016095-1 · issued Aug 26, 2016 · closed Jul 17, 2020Closed
- Update FHWA Order 5020.1 or develop Agency guidance to state FHWA's policy concerning compliance with Title 23 U.S.C. Section 102(b ), including the following: a) Define when a project…DOT OIG ST2016095-3 · issued Aug 26, 2016 · closed Jul 17, 2020Closed
- Develop and implement financial controls and processes to monitor PE projects exceeding the 10-year limit, approved extensions, and reimbursements not pursued when PE projects do not…DOT OIG ST2016095-5 · issued Aug 26, 2016 · closed Jul 17, 2020Closed
- Develop and implement an action plan that establishes target action dates and assigns responsibility for following up on the key recommendations from the 2015 National Review of State Cost…DOT OIG ST2019020-1 · issued Mar 13, 2019 · closed Jul 1, 2020Closed
- Ensures that the Authority complies with special tests and provisions requirements.DOT OIG SA2018069-2 · issued Aug 15, 2018 · closed Apr 17, 2020Closed
- Ensures that the State complies with matching, level of effort, earmarking requirements.DOT OIG SA2017097-1 · issued Sep 11, 2017 · closed Apr 7, 2020Closed
- Determine the allowability of the $5,824 transaction, then review all construction projects to ensure that expenditures were properly paid within the period of performance, and recover any…DOT OIG SA2018052-2 · issued May 2, 2018 · closed Apr 7, 2020Closed
- Ensures that the Authority complies with the activities allowed or unallowed requirements.DOT OIG SA2019034-2 · issued Mar 27, 2019 · closed Apr 7, 2020Closed
- Ensures that the Department complies with the subrecipient monitoring requirements.DOT OIG SA2019036-1 · issued Mar 26, 2019 · closed Mar 31, 2020Closed
- Ensures that the NM DOT complies with the subrecipient monitoring requirements.DOT OIG SA2018044-2 · issued Apr 30, 2018 · closed Mar 30, 2020Closed
- Ensures that the Council complies with the reporting requirements.DOT OIG SA2019071-2 · issued Sep 10, 2019 · closed Mar 25, 2020Closed
- Collect and analyze HBP expenditure data on a regular basis to identify activities undertaken by states such as bridge replacement and rehabilitation to improve the condition of the…DOT OIG MH2010039-1 · issued Jan 14, 2010 · closed Mar 2, 2020Closed
- Report regularly to internal and external stakeholders on the effectiveness of states' efforts to improve the condition of the Nation's deficient bridges based on the analysis of HBP…DOT OIG MH2010039-3 · issued Jan 14, 2010 · closed Mar 2, 2020Closed
- Develop and implement internal controls to prevent FHWA authorization of construction projects after State DOT advertisement for bid or contract award to ensure compliance with Federal…DOT OIG ST2017024-3 · issued Feb 7, 2017 · closed Feb 27, 2020Closed
- KPMG recommends that FHWA management develop and implement a process to require documentation of the UPACS audit log review to be maintained to include documentation of the date reviewed,…DOT OIG QC2019024-3 · issued Mar 20, 2019 · closed Feb 20, 2020Closed
- KPMG recommends that FHWA management update the UPACS standard operating procedures or other appropriate documentation to reflect the new audit log review process.DOT OIG QC2019024-4 · issued Mar 20, 2019 · closed Feb 20, 2020Closed
- Complete the update of the MOAs on coordination with FTA.DOT OIG ST2017019-4 · issued Jan 5, 2017 · closed Jan 24, 2020Closed
- Establish a process for Division Offices to promptly inform the FHWA Headquarters Office of Bridges and Structures when additional resources are needed to complete a review of the State's…DOT OIG ST2015027-4 · issued Feb 18, 2015 · closed Jan 16, 2020Closed
- Update the checklist for agreement files that describes whatpre- and post-award documentation is required under current DOT and FHWApolicies.DOT OIG ZA2019051-4 · issued May 1, 2019 · closed Jan 13, 2020Closed
- Revise the quality assurance review process to fully communicate the results of the annual reviews to appropriate Division Offices and track the actions taken to address its recommendations.DOT OIG ST2015027-2 · issued Feb 18, 2015 · closed Dec 20, 2019Closed
- Develop and implement a comprehensive risk management process for NBIPOT to identify, report, and track mitigation actions for high-priority risks to bridge safety at the national level.…DOT OIG ST2015027-5 · issued Feb 18, 2015 · closed Dec 20, 2019Closed
- Update policies and procedures to determine when it is appropriate to require approval of recipient subcontracts or subawards and communicate this requirement to recipients; review the…DOT OIG ZA2019051-3 · issued May 1, 2019 · closed Nov 22, 2019Closed
- Revise Bridge Program Manual guidance to specify how Division Offices should combine and report results when separate assessments of the National Bridge Inspection Standards oversight…DOT OIG ST2015027-3 · issued Feb 18, 2015 · closed Nov 15, 2019Closed
- Develop and implement a process to identify best practices for improving the resilience of emergency relief projects and share them with Division Offices and State DOTs.DOT OIG ST2018014-2 · issued Jan 10, 2018 · closed Nov 7, 2019Closed
- Increase FHWA's use of element-level data by incorporating AASHTO's updated standards into the NBIS through the rulemaking process.DOT OIG MH2009013-4b · issued Jan 12, 2009 · closed Oct 21, 2019Closed
All 338 closed recommendations